Night flow auditing of water supply infrastructure to identify leaks during the Defects Liability Period, as required under IW-CDS-5020-03 Section 4.14.
Get a QuoteFollowing issue of the Conformance Certificate, Irish Water requires night flow audits to be carried out on the water supply infrastructure within a Development during the Defects Liability Period, at the frequency required by Irish Water's field engineers (IW-CDS-5020-03, Section 4.14). The audit uses the bulk meter or night flow chamber installed within the Development to measure the minimum night flow — any flow above the expected level indicates a leak within the water supply infrastructure. We carry out night flow audits on behalf of developers, interpret the results, and where a deficit is identified, carry out leak investigation, acoustic leak detection, and repair to restore compliance.